Home / FAQs / Which Document Do I Actually Need
30 answered questions

Which Document Do I Actually Need

Swept path analysis for UK planning applications, answered in plain English.

What is the difference between a CTMP, a CMP, a CLP, a CEMP and a construction phase plan?#

They are five different documents and only three of them are planning documents. A Construction Traffic Management Plan and a Construction Logistics Plan both deal with construction vehicles, routing and highway impact, and are required by the local planning authority. A Construction Management Plan is broader and, per the TfL and CLOCS guidance, details the procedures, sequencing and methodology for a project covering both on-site activity and the transport arrangements for vehicles servicing the site. A Construction and Environmental Management Plan covers how the project will avoid, minimise or mitigate effects on the environment. A construction phase plan is not a planning document at all: it is required by regulation 12 of the Construction (Design and Management) Regulations 2015 and deals with health and safety.

Which of these documents does my planning condition mean?#

Read the condition wording, not the acronym. If it asks for vehicle routing, access, wheel washing, delivery scheduling or construction vehicle numbers, it means traffic and logistics content whatever it is titled. If it asks about noise, dust, working hours and ecology, it means environmental content. If it mentions health and safety arrangements or site rules, that is a construction phase plan and it is not normally secured by planning condition, because it is already a statutory duty.

Why do these documents have such similar names?#

Because there is no single statutory naming convention for the planning ones. Local authorities adopted their own terms over time, and the national guidance came later. The TfL and CLOCS guidance uses Construction Logistics Plan. Many authorities outside London use Construction Traffic Management Plan for the same content. Construction Management Plan is used more loosely again. The construction phase plan is the odd one out because its name comes from legislation.

Do I need all five documents?#

Almost never. Most schemes need one or two planning documents plus, if construction work is happening, a construction phase plan because that is a legal requirement regardless of planning. Check the decision notice for which conditions actually apply to you before commissioning anything.

What is a construction phase plan?#

A health and safety document required by regulation 12 of the Construction (Design and Management) Regulations 2015. Regulation 12(1) requires that during the pre-construction phase, and before setting up a construction site, the principal contractor must draw up a construction phase plan. Regulation 12(2) requires it to set out the health and safety arrangements and site rules, taking account where necessary of the industrial activities taking place on the construction site.

What is a construction phase plan cdm?#

The same document. CDM refers to the Construction (Design and Management) Regulations 2015, which is where the requirement comes from. People search for it with "cdm" attached because that is how it is referred to on site. The governing provision is regulation 12.

What is a construction phase plan cpp?#

CPP is the common abbreviation for construction phase plan. It is worth being careful with abbreviations in this area: CPP, CMP, CTMP, CLP and CEMP are five different documents and mixing them up in correspondence with a case officer creates avoidable confusion.

What is a construction phase safety plan?#

Another way people refer to the construction phase plan. There is no separate document called a construction phase safety plan in the regulations. Regulation 12(2) is explicit that the plan sets out health and safety arrangements and site rules, so the safety content is the plan.

What is a pre construction phase plan?#

There is no document with that name in the regulations. What exists is the pre-construction phase, during which regulation 12(1) requires the principal contractor to draw up the construction phase plan. The related pre-construction item is pre-construction information, which regulation 12(3) requires the principal designer to pass on where relevant to the plan.

Who prepares the construction phase plan?#

The principal contractor. Regulation 12(1) is explicit: during the pre-construction phase, and before setting up a construction site, the principal contractor must draw up the construction phase plan. It is not the client's document and not the designer's document.

Who is responsible for the construction phase plan?#

The principal contractor, both for drawing it up under regulation 12(1) and for keeping it current. Regulation 12(4) requires that throughout the project the principal contractor must ensure the plan is appropriately reviewed, updated and revised from time to time so that it remains sufficient.

Who approves a construction phase plan?#

Nobody approves it in the way a planning authority approves a CTMP. It is a statutory duty rather than a submission, so there is no discharge process and no approving body. That is one of the clearest practical differences between a construction phase plan and a CTMP or CLP, which do have to be submitted and approved.

Who writes a construction phase plan?#

The principal contractor, under regulation 12(1). In practice a health and safety adviser may draft it, but the duty and the responsibility sit with the principal contractor and cannot be delegated away by using a consultant.

Who is responsible for preparing a construction phase plan?#

The principal contractor. If a project has only one contractor rather than a principal contractor, that contractor takes on the duty. The point of regulation 12 is that the person controlling the construction work is the person who plans its health and safety.

Who provides construction phase plan information?#

The principal designer contributes the information. Regulation 12(3) requires the principal designer to assist the principal contractor by providing all information the principal designer holds that is relevant to the construction phase plan, including pre-construction information obtained from the client.

Who prepares the construction management plan?#

Usually the applicant's consultant at planning stage, or the principal contractor at pre-construction stage, depending on what the condition requires and when. Unlike the construction phase plan there is no statutory allocation of who must write a CMP, because it is a planning document created by condition rather than by regulation.

Who prepares a construction environmental management plan?#

Typically an environmental consultant or the contractor's environmental adviser, again depending on what the condition requires. As with the CMP there is no statutory allocation. The TfL and CLOCS guidance describes a CEMP as outlining how a construction project will avoid, minimise or mitigate effects on the environment and surrounding area.

Who uses a construction phase plan?#

Everyone working on the site, because regulation 12(2) requires it to set out the site rules. In practice it is used by the principal contractor to run the site, by subcontractors to understand the rules they are working to, and by the HSE if it inspects.

Is a construction phase plan always required?#

The requirement in regulation 12(1) applies to construction projects, and it is expressed as a duty rather than a threshold. Where there is construction work with a principal contractor, or a single contractor taking that role, a plan is needed. Take advice from a competent health and safety adviser on your specific project rather than assuming an exemption.

Is a construction phase plan required for all projects?#

Treat it as required unless you have competent advice that it is not. The regulation frames it as a duty on the principal contractor during the pre-construction phase of a project, not as something triggered by size or value. The scale and detail of the plan should be proportionate to the risk, which is a different question from whether one exists.

Do all projects need a construction phase plan?#

The duty in regulation 12 attaches to construction projects generally. What changes with project size is how long and how detailed the plan needs to be, not whether one is needed. A small domestic job needs a short proportionate plan, not no plan.

Do you need a construction phase plan for maintenance work?#

It depends on whether the work is construction work within the meaning of the regulations, which is a legal question about the nature of the work rather than what it is called. Routine servicing generally is not; refurbishment, repair and alteration generally are. This is a point to confirm with a competent health and safety adviser for your specific activity.

Is a construction phase plan the same as rams?#

No. A risk assessment and method statement covers how a specific task will be done safely. The construction phase plan covers the health and safety arrangements and site rules for the project as a whole, under regulation 12(2). The plan sets the framework; RAMS sit inside it for individual activities.

Does a construction phase plan include rams?#

It references them rather than containing them. The plan sets out the arrangements and site rules; individual task-level risk assessments and method statements are produced as the work is planned and sit underneath. Regulation 12(4) requiring ongoing review is part of why they are kept separate: RAMS change far more often than the plan.

What is the difference between a construction phase plan and rams?#

Scope and level. The plan is project-level and required by regulation 12. RAMS are task-level and produced for specific activities. One plan, many RAMS.

What is the difference between a construction phase plan and a method statement?#

A method statement describes the sequence and method for carrying out one particular operation safely. The construction phase plan sets the project-wide health and safety arrangements and site rules under regulation 12(2). A method statement answers how this task is done; the plan answers how this site is run.

What is the difference between a construction phase plan and the health and safety file?#

Timing and audience. The construction phase plan is drawn up before the site is set up and used during construction. The health and safety file is about the completed structure and is for whoever maintains or alters it afterwards. One runs the build, the other outlives it.

Is a CEMP the same as a CMP?#

No. The TfL and CLOCS guidance distinguishes them: a CEMP outlines how a project will avoid, minimise or mitigate effects on the environment and surrounding area, whereas a CMP details the procedures, sequencing and methodology for the project aimed at demonstrating how the impact of construction can be minimised in relation to both on-site activity and the transport arrangements for vehicles servicing the site.

I have been asked for a document and I do not know which one it is. What should I do?#

Send the case officer the exact condition wording and ask what content they expect. It takes one email and it is far cheaper than commissioning the wrong document. Officers generally answer this readily because an accurate submission saves them a review cycle too.